The Open Guide to London: the free London guide - Differences between Version 6 and Version 2 of Category Trams

Version 6 Version 2
== Line 1 ==

==== History ====
Trams were a prominent feature of life in London until the 50s, when much damage from [[World War 2]] was deemed too expensive to repair and the internal combustion engine was seen as the way forward. Gradually all trams were replaced by [[trolleybuses]] and then diesel buses such as the venerable [[Routemaster]], until the [http://news.bbc.co.uk/onthisday/hi/dates/stories/july/7/newsid_2963000/2963092.stm last tram arrived at New Cross] on 7 July 1952.

However, trams have experienced a revival across the UK in recent years, with Manchester, Birmingham and Sheffield getting their own tram systems and many others under construction (Nottingham) or development (Bristol, South Hampshire, Leeds, Edinburgh, Newcastle).

==== Croydon ====
In London, one of the first new tram systems to be opened is the [[Locale Croydon|Croydon]] Tramlink, with the first tram running on 16 June 1999 after 30 months' work . The 28km system consists of three routes running on mostly segregated track between [[Locale Wimbledon|Wimbledon]], a loop around [[Locale Croydon|Croydon]] centre, [[Locale New Addington|New Addington]], [[Locale Elmers End|Elmers End]] and [[Locale Beckenham|Beckenham]].

The tram route took over an underused rail route from Railtrack which used to run at relatively low frequency between Wimbledon and [[West Croydon station]]. The central loop serving both central Croydon stations and the main shopping areas is on-street, as is the eastern section out to Sandilands. After this, two branches take advantage of another disused/underused Railtrack route, with the final sections to Elmers End and New Addington generally being of new construction. The single track section between [[Birkbeck]] and [[Beckenham Junction Station | Beckenham Junction]] took over one track of the low-frequency line from here into Victoria.

Croydon Tramlink has been immensely successful, now carrying over 20m passengers per annum - far above original estimates. It has also surpassed environmental targets, removing 4 million car journeys per annum from Croydon's roads.

Note that a travelcard including any of zones 3, 4, 5 or 6 is valid on the entire Tramlink network.

[http://www.croydon-tramlink.co.uk/ Croydon Tramlink - The Unofficial Site] has a [http://www.croydon-tramlink.co.uk/info/gen/map-large.html map of the system].

==== Further Projects ====
Croydon Tramlink has had such success that two new tram schemes are under development. [[Cross River Transit]] is a new north-south scheme for Central London. It will run from termini at [[Camden Town Station | Camden Town]] and [[King's Cross St. Pancras Station | King's Cross]] in the north (serving the old King's Cross railway lands which are under redevelopment), joining at Woburn Place before running down to [[Russell Square]], [[Holborn]], [[Aldwych]], [[Waterloo Bridge]], [[Waterloo Station | Waterloo]] and the [[Elephant and Castle Station | Elephant & Castle]]. After this it will split into two southern branches, one serving [[Walworth]] and [[Peckham]] to the southeast (terminating at [[Peckham Rye Station | Peckham Rye]]), and the other serving [[Kennington]], [[Stockwell]] and possibly [[Brixton]] to the southwest.

Peak frequency is envisaged to be 40 trams per hour (approximately one every 90 seconds) through the central section, with 70 million passengers per annum forecast to use the service. Construction is predicted to cost �268 million.

==== West London Transit ====

The second tram scheme envisaged for London is the West London Transit scheme. This will run along the [[Uxbridge Road]] between [[Uxbridge]] and [[Shepherd's Bush]], serving areas such as [[Hayes]], [[Southall]] and [[Ealing]] on the way. This route is a heavily-used bus corridor and is therefore considered ideal for a tram scheme. However, this scheme will impact on local traffic more adversely than either Croydon Tramlink or Cross River Transit.

==== Croydon Tramlink Extensions ====
The success of Tramlink has lead to the consideration of [http://www.tfl.gov.uk/trams/initiatives/ini_index_tlext.shtml a number of extension possibilities], including routes to Sutton, Tooting, Purley, Crystal Palace, Bromley and Lewisham.
== Line 33 == == Line 5 ==
formatted_website_text='http://www.tfl.gov.uk/trams/ '
host='213.152.57.251'
formatted_website_text=''
host='212.18.231.50'
== Line 37 ==
major_change='0'
== Line 12 == == Line 12 ==
website='' website='http://www.tfl.gov.uk/trams/' website='' website='http://www.tfl.gov.uk/trams/'

View all pages in Category Trams


List all versions