The Open Guide to London: the free London guide - Differences between Version 7 and Version 6 of Jubilee Line Extension

Version 7 Version 6
== Line 2 == == Line 2 ==
The extension was opened in stages. The first stage was the section from Stratford to [[North Greenwich Station|North Greenwich]] in East London. This opened to serve the [[Millennium Dome]]. The second stage from there to [[Waterloo Station|Waterloo]] opened on Fri 17 Sep 1999, with trains reversing at [[Bermondsey Station|Bermondsey]] until the platforms at Waterloo were ready for passengers.
Trains operated the whole section from Sat 20 Nov ([[http://news.bbc.co.uk/1/hi/uk/529006.stm see BBC news]])
and [[Charing Cross Station|Charing Cross]] closed.
[[Westminster Station|Westminster]]
and [[Southwark Station|Southwark]] stations were not ready for some time after this.
A detailed list of dates may be found at
[[http://www.davros.org/rail/culg/jubilee.html#dates Clive's UndergrounD Line Guides (Jubilee line)]]

The extension was opened in stages. The first stage was the section from Stratford to [[North Greenwich Station|North Greenwich]] in East London. This opened to serve the [[Millennium Dome]]. The second stage from there to [[Waterloo Station|Waterloo]] opened on Fri 17 Sep 1999, with trains reversing at [[Bermondsey Station|Bermondsey]] until the platforms at Waterloo were ready for passengers. [[London Bridge Station|London Bridge]] and [[Southwark Station|Southwark]] were also opened slightly after the other stations.
== Line 6 ==
[[http://news.bbc.co.uk/1/hi/uk/529006.stm Trains operated the whole section from Sat 20 Nov]] but [[Westminster Station|Westminster station]] was not ready for some time after this.
== Line 68 ==
address=''
== Line 70 == == Line 66 ==
edit_type='Normal edit'
fax=''
formatted_website_text=''
host='81.2.66.249'
hours_text='
'
edit_type='Minor tidying'
== Line 68 == == Line 68 ==
modified='2003-12-10 09:34:10' major_change='1'
map_link=''
opening_hours_text=''
phone=''
postcode=''
summary=''
website=''
modified='2003-12-10 09:34:10' website=''

The Jubilee Line Extension opened in late 1999, serving 11 new stations between Stratford and Green Park, enabling trains to run from Stanmore through to Stratford via the Docklands regeneration area. It crosses the River Thames 4 times.

The extension was opened in stages. The first stage was the section from Stratford to North Greenwich in East London. This opened to serve the Millennium Dome. The second stage from there to Waterloo opened on Fri 17 Sep 1999, with trains reversing at Bermondsey until the platforms at Waterloo were ready for passengers. London Bridge and Southwark were also opened slightly after the other stations.

http://www.trainweb.org/tubeprune/PSDs%20JLE.jpg
Platform edge doors (from [Tubeprune])

[Trains operated the whole section from Sat 20 Nov] but Westminster station was not ready for some time after this.

The Jubilee Line extension was one of London's biggest engineering projects to date and cost over 3.5 billion, making it one of the most expensive projects in the world at over 4 million per metre of its 16km length.

One of the unusual features of the extension is that all the new stations have platform edge doors which prevent wind from the piston effect of trains blowing through the station.

http://www.trainweb.org/tubeprune/Canary%20Wharf%20Ext.jpg
Canary Wharf (from [Tubeprune])

The architecture of the new stations has been critically acclaimed with several designed by Sir Norman Foster. The station at Canary Wharf in particular is massive by Underground scales; a section of one of the docks at Canary Wharf was filled in for the "station box", with a new park landscaped above two attractive semi-domed entrances.

The extension is one of the first sections of tube in London to provide step-free access throughout, although [some are concerned with levels of accessibility].

The extension serves the following stations:

The Jubilee Line Extension opened in late 1999, serving 11 new stations between Stratford and Green Park, enabling trains to run from Stanmore through to Stratford via the Docklands regeneration area. It crosses the River Thames 4 times.

The extension was opened in stages. The first stage was the section from Stratford to North Greenwich in East London. This opened to serve the Millennium Dome. The second stage from there to Waterloo opened on Fri 17 Sep 1999, with trains reversing at Bermondsey until the platforms at Waterloo were ready for passengers. London Bridge and Southwark were also opened slightly after the other stations.

http://www.trainweb.org/tubeprune/PSDs%20JLE.jpg
Platform edge doors (from [Tubeprune])

[Trains operated the whole section from Sat 20 Nov] but Westminster station was not ready for some time after this.

The Jubilee Line extension was one of London's biggest engineering projects to date and cost over 3.5 billion, making it one of the most expensive projects in the world at over 4 million per metre of its 16km length.

One of the unusual features of the extension is that all the new stations have platform edge doors which prevent wind from the piston effect of trains blowing through the station.

http://www.trainweb.org/tubeprune/Canary%20Wharf%20Ext.jpg
Canary Wharf (from [Tubeprune])

The architecture of the new stations has been critically acclaimed with several designed by Sir Norman Foster. The station at Canary Wharf in particular is massive by Underground scales; a section of one of the docks at Canary Wharf was filled in for the "station box", with a new park landscaped above two attractive semi-domed entrances.

The extension is one of the first sections of tube in London to provide step-free access throughout, although [some are concerned with levels of accessibility].